Island Park Septics
Septic systems in Island Park, Idaho, researched from the primary sources — permits, prices, and the people who do the work
Call or text (208) 656-1467 — a real local number, free to use

Published

What does the health district charge to review a lot split in Fremont County, Idaho?

Quick answer: Eastern Idaho Public Health's land development review runs $150.00 per lot — half with the application, half at final plat signing — plus a $150.00 signature fee, on the fee table effective 05/01/26. What moves the number most is the lot count: the per-lot line expressly includes lot splits, so a two-lot split pays twice.

The review you are paying for

Splitting a parcel runs through the health district's land development review — the same review that stands behind lifting a plat's sanitary restriction. The fee table prices it by the lot: "Land Development — per lot (includes lot splits; half at application, half at final plat signing)" at "$150.00," on the table marked "Amount (Effective 05/01/26)." The split itself is named in the row: a two-lot split pays for two lots, not one project. Beside the per-lot rows, "A Signature Fee of $150.00 sits beside the per-lot rows for the signing itself."

The cost table

ItemAmountBasisSource and date
Land development review$150.00Per lot — half at application, half at final plat signing; includes lot splitsEIPH Environmental Health Fee Table, effective 05/01/26, retrieved 5 October 2026
Signature fee$150.00Per final-plat signingSame fee table
State plat review — individual and subsurface sewage disposal$100 plus $20 per lotPer platIDAPA 58.01.14 §160, rule fee effective 7-1-25
State plat review — other than subsurface disposal$25Per platIDAPA 58.01.14 §160, rule fee effective 7-1-25

Two layers sit in that table, and conflating them is the classic counter surprise: "IDAPA 58.01.14 is the state rule layer — what the rule says the service costs. The health district’s own permit fee schedule is a separate set of numbers, and confusing the two is how people end up surprised at the counter." No page in this site's sources says whether a lot split pays the state rule's plat fee on top of EIPH's own per-lot fee — they print as two separate layers, and the district desk settles which applies to your parcel.

When each half is due

"Half of the fee is to be submitted with application, the remainder on signing the final plat." — Eastern Idaho Public Health, Environmental Health Fee Table, Effective 05/01/26, retrieved 5 October 2026. What goes in with the first half: "Present the proposal with the completed application, the land development fee, and a full-size scaled preliminary plat." And nothing moves on the ground before the paperwork: "Nothing on-site happens until an application, the fee, and a preliminary plat prepared by an Idaho Licensed Surveyor are in — and any soils, groundwater, wetland or floodplain engineering already done on the property goes in with them." At the end, "the applicant receives the correct sanitary restriction language for the plat and pays any remaining fees at signature."

What moves the number

A fee is not an approval

Paying the review does not promise the restriction lifts: "Failure to provide all information as requested, or if the environmental evaluation shows the Subsurface Sewage Disposal Rules (IDAPA 58.01.03) can’t be met, EIPH may deny the lifting of sanitary restrictions."

How to get a real number

Take the completed application, the land development fee and a full-size scaled preliminary plat by an Idaho Licensed Surveyor to the district's Fremont County desk: "The health district’s Fremont County location is 45 S 2nd W, St. Anthony, (208) 522-8065" (as quoted from the county permit page). Ask two things while you are there: whether your split also owes the state rule's plat row, and what the current fee table prints. The county's own subdivision fees, the surveyor, the test holes and any nutrient pathogen analysis are separate costs not in the sources this page uses.

Common questions

How much does EIPH charge to review a lot split?

$150.00 per lot plus a $150.00 signature fee, on the fee table effective 05/01/26 — half the per-lot fee with the application, the rest at final plat signing.

When do I pay?

"Half of the fee is to be submitted with application, the remainder on signing the final plat."

Does a two-lot split pay twice?

Yes — the per-lot line expressly includes lot splits; a two-lot split pays for two lots, not one project.

Does the state charge on top?

IDAPA 58.01.14 §160 prices plat review at $100 plus $20 per lot (subsurface disposal) or $25 (other). Whether a lot split owes that row on top of EIPH's per-lot fee is not stated in the sources this page uses — confirm with the district.

Can the fee change before I sign?

The table says so: "We reserve the right to adjust fees prior to signature of plot."

What if groundwater is close to the surface?

Monitoring through a complete spring and summer season — and "miss the spring window and the monitoring waits a year."

Related: Sanitary restrictions on a land division · The EIPH septic fees nobody lists · Nutrient pathogen analysis · What a home-sale septic evaluation costs · Fremont County septic permit

Splitting a parcel near Island Park? The homepage form or (208) 656-1467, call or text.

Island Park Septics · LPT Realty · SP49090