Published
Pit privy or vault privy: which outhouse belongs on your Island Park lot?
The ground decides: a pit privy needs soil that can accept and treat blackwaste below it, while a vault privy — a sealed tank, pumped periodically by a permitted pumper — suits lots with seasonal high groundwater, shallow rock, or fast-draining gravel. Both are permitted through Eastern Idaho Public Health, per the DEQ Technical Guidance Manual, December 2025.
The difference, dimension by dimension
| Dimension | Pit privy | Vault privy | Source |
|---|---|---|---|
| Under the toilet | An excavation in natural soil | A sealed vault: an approved septic tank or preapproved vault unit | TGM 4.17, 4.29 |
| The ground's job | Accept and treat blackwaste below the pit | Nothing — it holds everything, at septic-tank separation distances | TGM 4.17.2, 4.29 |
| Soil rules | Clay acceptable; impermeable layers waived — but effective soil depths still apply | Built for ground that rejects pits: wet ground, shallow rock, fast gravels | TGM 4.17.2, 4.29 |
| Size | Pit at least 3 feet wide, 4 feet deep, never past 6 feet | 375 gallons per toilet, never less than 500 | TGM 4.17.3, 4.29 |
| Service | None on a schedule | Pumped periodically by an Idaho-permitted pumper; secured outside port; truck access | TGM 4.29 |
| Floodway | Not for floodways | Not for floodways | TGM 4.17.2, 4.29 |
| Building above | Fly-proof to 1/16 inch; 3-inch vent through the roof | Same spec, vent stack outside; south side recommended | TGM 4.17.4, 4.29 |
| The end | Abandoned at 16 inches of blackwaste — or when a septic system goes in | Same: a subsurface system ends the privy | TGM 4.17.2 |
DEQ Technical Guidance Manual, December 2025 — section 4.17 retrieved 16 October 2026; section 4.29 retrieved 21 October 2026.
Why the ground decides
The definitions carry the whole argument. "A pit privy is a building that contains a toilet facility located over an excavation in natural soil for the disposal of blackwaste" — the pit leans on soil. "A vault privy is a sealed underground vault for the temporary storage of nonwater-carried sewage" — the vault leans on a pump truck.
The pit's soil rules are generous because a privy only ever receives blackwaste, not the hundreds of gallons a day a plumbing-fed system handles: at the pit, "Clay soils of all types are acceptable" and "Impermeable layer restrictions are waived." But effective soil depths and separation distances must still be met — wet ground or shallow rock can still reject a pit. The vault fills that gap: sealed, watertight, holding everything until the pump truck comes.
Choose a pit privy when…
- The ground below can accept and treat blackwaste — soil depths and separations met, out of the floodway.
- You want no standing service: no pumper, no schedule, no recurring bill.
- Nothing on the property is served by pressurized water.
Choose a vault privy when…
- Wet ground, shallow rock, or fast-draining gravel sits where the pit would go.
- You can commit to the service: a permitted pumper, a secured outside port, truck access.
- The site is still out of the floodway — a vault does not buy floodway siting.
Costs — the published numbers
- Vault privy permit: $450 — EIPH's "Tank only & vault privy permit" row (application packet rev. 10/2024, retrieved 2026-08-12).
- Pit privy fee: not listed — the fee table names no pit-privy row; ask EIPH, 45 S 2nd W, St. Anthony, (208) 522-8065.
- Vault service: quoted per job — no Island Park pumper publishes a rate card, and the manual fixes no interval beyond "periodically."
- Pit service: none until the end — the close-out fills the pit with rock-free soil graded for about 12 inches of settling.
The Board of Health sets these numbers and can move them — re-check the current fee table before paying.
Shared rules neither escapes
Bring pressurized water to any structure on the property and both privies are finished as the plan: "Structures on the property served by water under pressure must install a subsurface sewage disposal system" (TGM 4.17.2). When that system goes in, the abandonment clause takes over. A vault privy runs through the same Eastern Idaho Public Health permit process on the tank-only track; the pit privy's manual section lists its installer registration permit as "Property owner or standard and basic," with "Licensed professional engineer required: No" — an owner can pull the permit and dig personally.
Common questions
What is the difference between a pit privy and a vault privy?
The pit is a toilet "over an excavation in natural soil for the disposal of blackwaste." The vault is "a sealed underground vault for the temporary storage of nonwater-carried sewage" — a tank that accepts nothing and waits for the pump truck. (DEQ TGM, December 2025.)
Which one works on wet or rocky ground?
The vault. A pit must still meet effective soil depths and separation distances despite its clay and impermeable-layer waivers, so seasonal high groundwater or shallow rock can reject it. The sealed vault holds everything instead of asking the ground to treat it.
How big does each one have to be?
A pit: "at least 3 feet wide on all sides and 4 feet deep but no deeper than 6 feet below original ground level." A vault: "375 gallons for each toilet, except that no tank may be less than 500 gallons" — one seat: 500 minimum; two: 750.
Who pumps a vault privy, and how often?
"The vault must be pumped by an Idaho-permitted septic tank pumper," with disposal at an approved site. The manual says "periodically" and fixes no interval — set the schedule with your pumper.
Can I keep either privy after running water arrives?
No. "Structures on the property served by water under pressure must install a subsurface sewage disposal system," and the privy permit's abandonment clause takes over once that system is installed.
What do the permits cost?
The vault-privy track is listed at $450 (EIPH application packet rev. 10/2024, retrieved 2026-08-12). The schedule names no separate pit-privy row — confirm with the district, and re-check the current table before budgeting.
Read more
- Pit privy rules in full — does an outhouse need a permit in Idaho? (/does-an-outhouse-need-a-permit-idaho)
- Vault privy spec — what is a vault privy? (/what-is-a-vault-privy-idaho)
- Permit steps and fees — the Fremont County septic permit walkthrough (/fremont-county-septic-permit)
- Sorting help for your lot: call or text (208) 656-1467.